Two Navy F-35C jets completed the first launch and recovery testing on a Gerald R. Ford-class carrier, the future USS John F. Kennedy, Lockheed Martin said. A Lockheed official said the Navy holds final clearance.
Two US Navy F-35C Lightning II fighters have completed the jet's first launch and recovery trials aboard a Ford-class carrier, the future USS John F. Kennedy, Lockheed Martin said Thursday.
Key specifications
- Aircraft Two F-35C jets, VX-23
- Ship Future USS John F. Kennedy
- Test period 11 days from Oct. 13
- Flights 34 flights
- Launches/landings 122 catapult launches, 122 arrested landings
- Formal delivery Planned spring 2027
During 11 days of testing that began Oct. 13, the jets flew 34 times, making 122 catapult launches and 122 arrested landings, the company said. The aircraft belong to Air Test and Evaluation Squadron 23 (VX-23) at Naval Air Station Patuxent River, Maryland. The Navy said the flights were part of Kennedy's Aircraft Compatibility Testing.
Ford-class carriers use the Electromagnetic Aircraft Launch System and the Advanced Arresting Gear rather than the steam catapults and hydraulic arresting gear on Nimitz-class ships. Lockheed said the at-sea trials followed shore-based testing from January 2024 to May 2025, and the data will help shape launch and recovery guidance for Ford-class crews.
Clearance and carrier status
Sean Jackson, vice president of Lockheed Martin's F-35 Development Program, said the Navy has cleared the F-35C for operations across its entire carrier fleet. A Lockheed official told Defense News the ships can launch and recover F-35s once bulletins are published, but will not be ready to deploy until fully outfitted, and that the Navy has final clearance.
The Navy took preliminary acceptance of Kennedy on Sept. 29. It said the ship was about 99% complete, with formal delivery planned for spring 2027.
Frequently asked questions
Has the F-35C operated from a Ford-class carrier?
Yes. Two Navy F-35Cs completed the jet's first launch and recovery trials aboard the future USS John F. Kennedy, Lockheed Martin said, with 122 launches and 122 landings.
When will USS John F. Kennedy be delivered?
The Navy plans formal delivery in spring 2027. It took preliminary acceptance on Sept. 29, when it said the ship was about 99% complete.
Sources: Defense News.
AI-assisted: drafted with AI from the sources above and reviewed by an editor.


